Help protect Africa's 

Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

Focus on Wildlife in Nature

As Africa’ s energy needs increase, and the continent embraces the growth and implementation of green energy, a number of innovative methods have had to be developed to reduce the negative interactions between wildlife and infrastructure.

The Endangered Wildlife Trust’ s Wildlife and Infrastructure (WIN) Unit, has developed numerous innovative methods to reduce these interactions, work to positively influence utilities’ wildlife management policies, and ultimately phase out problematic processes and hardware. Through adaptive management and the development of pioneering and innovative techniques, South Africa is now recognised as a world leader in managing the burden of wildlife damage on electrical infrastructure while addressing the threats to wildlife.

In the final article of the three-part series, the WIN team discusses the monitoring of bird species before and after the construction of energy facilities.

Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

By Hennie de Beer, Tamanna Patel, Matt Pretorius, Oscar Mohale, Kish Chetty

 

Bird monitoring along power lines to reduce collision and electrocution risks in South Africa.

South Africa’ s Wind Energy Facilities (WEF) track bird activities closely, before and after construction. Power lines get no such attention once they run beyond a facility’ s own footprint. This article explains why that gap persists and what it would take to close it.

The line that goes unwatched

Wind energy has benefited from a decade of increasingly refined monitoring protocols. Power lines have not. Guidance does exist, including the World Bank’ s overhead-line survey methods, but it was designed mainly for lines associated with a WEF, not for the thousands of kilometres of transmission and distribution corridors that cross the country independently. For overhead lines outside a WEF, the guidance itself acknowledges that there is no standard method; monitoring is left to case-by-case judgement based on line length, risk and available resources.

Northern Cape wind farms uncovered electrocution risk on their own above-ground collector lines because those lines sat within a monitored WEF footprint. Beyond that footprint, two forms of monitoring exist, but neither systematically catches bird fatalities. Eskom carries out annual/biannual line inspections, carried out by technical staff as part of routine hardware checks, regularly pick up wildlife mortalities, and flag structures that pose a collision or electrocution risk, feeding into the Eskom and Endangered Wildlife Trust Strategic Partnership’ s hotspot identification and structure reconfiguration work.

Certain recent lines have monitoring built into their Environmental Management Programme (EMPr), where the Environmental Impact Assessment (EIA) process identified them as crossing sensitive areas under the National Screening Tool and DFFE Powerlines Strategic Environmental Assessments (SEAs). The opportunity is to build on that foundation, not to start from nothing. Folding a short wildlife checklist into the hardware inspections technical staff already carry out, rather than treating bird monitoring as a separate exercise, could extend coverage across the network at a fraction of the cost of a standalone programme. The same logic applies to lines built before the National Screening Tool existed: routine inspections could flag them for a one-off risk review rather than requiring a wholesale audit of the older network.

Species we still do not understand well enough

Some species remain difficult to protect because the available data is still limited. The Black Harrier (Circus maurus) is an exception. Near-endemic to southern Africa and listed as Endangered, it is one of the better-studied cases: its regional population is estimated at only 733 to 938 mature individuals and is declining by about 2.3% each year. Population viability modelling suggests that the species has a greater than 50% chance of extinction within 75 to 100 years if fatalities increase by only three to five adult birds per year above baseline mortality.

BirdLife South Africa’ s 2025 Red Data Book assessment records at least 13 confirmed adult Black Harrier fatalities across South Africa’ s 33 operational WEFs since 2014. Once under-detection is considered, the true number could be closer to double, leaving little margin before the population reaches the fatality threshold identified by modelling.

Bustards present a different kind of knowledge gap. Ludwig’ s Bustard (Neotis ludwigii), which is Endangered and nomadic, and Denham’ s Bustard (Neotis denhami), listed as Vulnerable, appear in national fatality records at turbines and along power lines. At turbines, Ludwig’ s Bustard and Denham’ s Bustard, the recorded numbers are still single digits, too few to reveal which routes, seasons or conditions carry the highest risk. The picture for power line fatalities is less settled: current published data understates the true toll, with more recent findings not yet in print suggesting the numbers are higher.

Verreaux’ s Eagle (Aquila verreauxii) and Martial Eagle (Polemaetus bellicosus) face a related problem at a larger scale. Both are killed by turbine collision and by electrocution on power lines, but no single dataset currently combines turbine and power-line records to show the total pressure on either population.

Where the turbine solution runs out

Bird Flight Diverter (BFD) design must match a species’ activity pattern, and proving that a diverter works requires a genuine Before-After-Control-Impact (BACI) study, rather than simply observing a decline in fatalities. For turbines, the practical approach is deliberate zoning: selecting turbines with comparable pre-treatment collision rates, then leaving some unmarked controls while fitting the rest with diverters. Zoning by risk level and treating only the high-risk turbines would bias the comparison from the outset, since the control and treatment groups need equivalent baseline exposure for the before-after comparison to hold.

It is tempting to assume that the same model can be carried over to power lines. It cannot, at least not cleanly. BACI’ s statistical strength depends on collision rates being comparable between control and treatment groups before mitigation begins. At a single WEF, turbines usually share broadly similar terrain, spacing and species exposure, making it relatively straightforward to identify suitable controls.

Power lines are different. A line can change character within only a few kilometres as span height, surrounding habitat and bird movement patterns shift from one section to the next. Treating an unmarked span as a control without first confirming that its pre-mitigation collision rate resembles that of the marked span is not a genuine comparison. A BACI study based on that assumption may look rigorous while producing unreliable conclusions.

The answer is not to delay mitigation until a perfect study becomes possible. Developers often have to prioritise immediate risk reduction over years of pre-marking baseline data collection because installation costs and project timelines do not disappear. The more practical solution is to design comparability into BFD rollouts from the outset, so that marking a line and evaluating whether the marking works are not treated as competing objectives.

Turning gaps into a plan

None of this erases what the first two articles in this series documented: pre-construction surveys can shape turbine layouts, post-construction monitoring can identify what those surveys missed, and adaptive management can measurably reduce fatalities. It does mean that the next phase of work has a clear focus:

  • Develop standardised guidelines for power-line monitoring, built for linear corridors rather than adapted point-based turbine protocols.
  • Extend post-construction monitoring requirements further along transmission and distribution networks, instead of stopping at WEF boundaries.
  • Build secondary ecological effects, such as those exposed in the Northern Cape case, into monitoring protocols from the start.
  • Use GPS tracking studies and updated distribution mapping to close data gaps for bustards, eagles and the Black Harrier.
  • Feed post-construction fatality data back into pre-construction collision-risk models, for both WEF and power lines, so each new and existing project improves on the predictions of earlier ones.
  • Use automated detection systems, including cameras and radar, to complement Shutdown on Demand where fast response is needed.
  • Create a shared industry database of collision and electrocution records so new projects can learn from the full evidence base, not only from site-specific reports.
  • Design BACI studies for power lines only where comparability between control and treatment spans is established before marking begins.

South Africa’ s wind sector has spent a decade building the monitoring culture described in this series. Applying the same investment to power lines is within reach. It begins by treating these gaps not as a verdict on work already done, but as the next items on a practical working list.

Further reading

  • BirdLife South Africa. 2025. Summary Bird Monitoring Reports from Operational Wind Energy Facilities in South Africa. BirdLife South Africa Occasional Report Series No. 3. BirdLife South Africa, Johannesburg, South Africa.
  • https://www.birdlife.org.za/wp-content/uploads/2025/02/Summary-of-Bird-Monitoring-Reports-Final-Version.pdf
  • Cervantes, F., Martins, M., and Simmons, R.E. 2022. Population viability assessment of an endangered raptor using detection/non-detection data reveals susceptibility to anthropogenic impacts. Royal Society Open Science 9: 220043.
  • International Finance Corporation, European Bank for Reconstruction and Development, and Kreditanstalt für Wiederaufbau. 2023. Post-Construction Bird and Bat Fatality Monitoring for Onshore Wind Energy Facilities in Emerging Market Countries: Good Practice Handbook and Decision Support Tool. Washington, DC: International Finance Corporation.
  • Lee, A.T.K., Rose, S., Banda, S., Bezeng, S.B., Maphalala, M.I., Maphisa, D.H., and Smit-Robinson, H.A. (eds). 2025. The 2025 Red Data Book of Birds of South Africa, Lesotho and Eswatini. Johannesburg, South Africa: BirdLife South Africa.
  • Smallie, J., Froneman, A., Smith, D.L., and Mulvaney, J.M. 2024. Shutdown on Demand for the mitigation of bird collision risk at onshore wind farms in South Africa. BirdLife South Africa, Johannesburg, South Africa.
Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

Focus on Wildlife in Nature

As Africa’ s energy needs increase, and the continent embraces the growth and implementation of green energy, a number of innovative methods have had to be developed to reduce the negative interactions between wildlife and infrastructure.

The Endangered Wildlife Trust’ s Wildlife and Infrastructure  Unit, has developed numerous innovative methods to reduce these interactions, work to positively influence utilities’ wildlife management policies, and ultimately phase out problematic processes and hardware. Through adaptive management and the development of pioneering and innovative techniques, South Africa is now recognised as a world leader in managing the burden of wildlife damage on electrical infrastructure while addressing the threats to wildlife.

In the second article in a series of three about the work being done by the EWT to mitigate the effect of power lines on wildlife, particular birds.

Planning for Flight Paths: Bird Monitoring at Energy Infrastructure

By Hennie de Beer, Tamanna Patel, Matt Pretorius, Oscar Mohale, Kish Chetty

 

Conservation scientists inspecting power lines for evidence of bird collisions.

Pre-construction monitoring cannot predict everything. Once infrastructure is operating, post-construction monitoring tracks what happens and adaptive management responds. Addressing problems during operation is almost always more costly than getting the planning right from the start, but some risks only become visible during operation. This article looks at what South African monitoring reveals, how adaptive management responds when problems emerge, and the interventions that are saving birds’ lives as a result.

What post-construction monitoring involves

Trained observers conduct regular carcass searches beneath turbines and along power lines, with results adjusted for scavenger removal (the proportion of collision fatalities removed by scavengers before carcass searchers can detect them) and searcher efficiency (the proportion of fatalities found versus missed by carcass searchers). Where overhead power lines are part of a wind farm, the same specialist teams extend their searches to those lines. Beyond a wind energy facility (WEF)’s footprint, no structured monitoring programme exists for power lines.

Monitoring relies on incident-based reporting through the Eskom and Endangered Wildlife Trust Central Incident Register, and on incidental discovery and ad hoc annual power line patrols. For power lines in sensitive areas, a structured monitoring and adaptive management plan must be part of the Environmental Management Programme (EMPr), something to extend and learn from the wind energy sector. Monitoring results feed into formal reports submitted to regulators every six months. This work is not simply counting; it is a verification process that compares actual outcomes with predictions, identifies what was missed, and triggers mitigation before losses accumulate.

What monitoring reveals

A recent analysis of post-construction data by BirdLife South Africa from 33 South African wind farms has produced results that challenged pre-construction predictions. Pre-construction surveys missed raptors nesting very close to turbines; this only became clear once carcasses were found.

Verreaux’s Eagle deaths peak between April and August, driven by the demands of the breeding season. Dassie colonies have also played a role, drawing hunting eagles toward turbines at some sites. New above-ground power lines brought a secondary hazard: in open landscapes where perching structures were scarce, freshly installed pylons attracted raptors to infrastructure that posed electrocution risks.

Success stories: when monitoring drives results

Landowner engagement for vulture-friendly farming has roots in power line conservation work that predates the wind energy sector. Wind farm operators have since adopted and expanded this approach through vulture food management programmes, using dedicated patrol teams to remove any dead animals promptly and reduce the food-related draw on turbine areas.

At one Eastern Cape wind farm, this reduced the Cape Vulture fatality rate from 0.07 to 0.02 vultures per turbine per year, a reduction of more than 70 percent sustained over six years. The same principle continues to be extended to power lines, pairing vulture-friendly farming practices with diverter installation on high-risk spans.

Shutdown on Demand places trained observers (Observer-led SDoD) at vantage points to watch for priority species approaching turbines, halting the relevant turbines within seconds of detection. By mid-2024, Observer-led SDoD programmes had been established at five South African wind farms: Dorper, Excelsior, Jeffreys Bay, Golden Valley and Roggeveld.

At a Western Cape site near the Potberg Cape Vulture colony, this prevented an estimated 7 to 19 Cape Vulture and one to four Black Harrier fatalities in a single year. The Black Harrier faces a zero-fatality threshold: the species cannot sustain any further mortality at all, making every fatality avoided critical at the population level. Weather, human error, and communication delays constrain its reliability. At Excelsior Wind Farm near Swellendam, Observer-led SDoD caused just over 56 hours of downtime in almost three years of operation, equating to less than one per cent of revenue lost, directly addressing concerns about implementation cost. Automated detection systems (technology-driven SDoD) combining cameras and artificial intelligence must be more widely tested as a complement to human observers if Shutdown on Demand is to scale effectively across the sector.

Blade patterning works by painting one blade to break the motion smear that makes rotating turbines effectively invisible to approaching birds. In Smøla, Norway, a single black blade reduced eagle fatalities by 100 % relative to unpainted controls over 10 years. At Umoya Wind Farm near Hopefield, South Africa, a trial using single red-striped blades on four turbines produced preliminary but promising results, recording zero raptor fatalities in the 16 months following patterning, compared with seven in the equivalent pre-treatment period. From at least two experiments conducted globally to date, further testing across different species and environments remains critical.

Securing approval to paint turbines blades a colour other than white required a coordinated push from South African Wind Energy Association (SAWEA), BirdLife SA and the Birds and Renewable Energy Specialist Group (BARESG) to obtain a Civil Aviation Authority blanket permit in January 2024, as existing regulations required blades to be white. Avifaunal specialists recommending this mitigation should consult the SAWEA/BirdLife SA/BARESG Blade Patterning Guidelines 2024 to ensure optimal design, colour and treatment coverage.

Post-construction monitoring at two Northern Cape wind farms over five years identified 12 Verreaux’s Eagles and 3 Martial Eagles electrocuted on above-ground collector lines. Wooden perches were installed to draw birds away from energised components, and insulation of the most dangerous structures was recommended. Underground burial of collector lines should be standard practice at all new wind farms where site conditions allow.

Getting mitigation selection right

Proving whether a measure is effective requires more than watching fatalities fall after it is introduced, since rates vary naturally from year to year. The most reliable evidence comes from Before-After-Control-Impact (BACI) designs that retain a comparison group.

This is not without controversy: the idea of deliberately leaving some turbines unpainted or some spans unmarked while bird fatalities continue is difficult to defend on conservation grounds alone. But without controls, background fatality rates are difficult to determine, and any observed improvement cannot be confidently attributed to the intervention. The practical solution is deliberate zoning: designating certain turbines or line sections as study controls while fully marking those nearest to sensitive areas or known breeding sites.

Bird flight diverters (BFDs) are devices attached to power line cables at regular intervals to increase their visibility to birds in flight, reducing collision risk. The choice of diverter design matters as much as the decision to mark a line. Most diverters are designed around daytime-active species, but cranes, bustards, and flamingos are also active in low-light conditions, and a diverter without features suited to be effective during periods of reduced visibility offers little practical protection. Recommending that every span (line section between two towers) be marked from the outset, while well-intentioned, can also preclude measuring whether the chosen design works for the relevant species. Proving BFD effectiveness through BACI studies requires that collision rates are comparable across treatment and control spans before marking begins, a condition that is more complex to meet on power lines than at turbines and demands careful study design from the outset. Article 3 examines this in more detail.

A long-term commitment

Monitoring and mitigation continue for as long as a facility operates. Wind farms have an operational life of approximately 20 years; power lines can remain in service for 50 years or more. These are operating costs, not construction costs, and should be planned and budgeted from the outset, not treated as afterthoughts once infrastructure is commissioned. For power lines, the difficult question is whether mitigation implementation is built into asset management plans that span half a century, or whether it disappears once construction is complete. Developers, regulators, avifaunal specialists, and the governments and development banks financing South Africa’s energy expansion all have a role in ensuring this commitment is sustained.

When knowledge saves lives

Post-construction monitoring creates a learning loop: every discovery feeds into adaptive management and improves how future projects are designed. Vulture food management, Shutdown on Demand, blade patterning, and infrastructure retrofits all demonstrate what that loop achieves. But it only works for infrastructure that is being watched.

The Endangered Wildlife Trust is in the early stages of developing guidelines for power line bird mitigation in South Africa, a development that will give practitioners the standardised framework the sector currently lacks. Article 3 turns to the power lines with no scheduled monitoring, the species whose behaviour we still do not fully understand, and the path to closing these gaps.

 

Further reading
  • BirdLife South Africa 2025. Summary Bird Monitoring Reports from Operational Wind Energy Facilities in South Africa. BirdLife South Africa Occasional Report Series No. 3. BirdLife South Africa, Johannesburg, South Africa. https://www.birdlife.org.za/wp-content/uploads/2025/02/Summary-of-Bird-Monitoring-Reports-Final-Version.pdf
  • SAWEA, BirdLife South Africa and Birds and Renewable Energy Specialist Group (BARESG). 2024. Blade Patterning Guidelines for Avian Specialists. South African Wind Energy Association and BirdLife South Africa. https://www.birdlife.org.za/wp-content/uploads/2024/10/SAWEA-BLSA-Blade-Patterning-Guidelines-2024.pdf
  • May, R., NygÃ¥rd, T., Falkdalen, U., Ã…ström, J., Hamre, Ø., and Stokke, B.G. 2020. Paint it black: Efficacy of increased wind turbine rotor blade visibility to reduce avian fatalities. Ecology and Evolution. 2020:1–9. https://doi.org/10.1002/ece3.6592
  • Stokke, B.G., NygÃ¥rd, T., Hamre, Ø., and May, R. 2024. NINA Report 2333. Norwegian Institute for Nature Research, Norway.
  • Smallie, J., Froneman, A., Smith, D.L., and Mulvaney, J.M. 2024. Shutdown on Demand for the mitigation of bird collision risk at onshore wind farms in South Africa. BirdLife South Africa, Johannesburg, South Africa.